This was a two-level home renovation of a Seattle family’s kitchen and basement.

Project duration: 7 months

Project cost: $95,000

The kitchen remodel

On the first floor, we removed a dividing wall to give the kitchen an open-concept feel. Then we installed fresh white IKEA cabinets, sleek stainless steel appliances, new hardwood floors, and lighting.

Unique touches, like the turquoise tile backsplash from Fireclay Tile, and built-in shelving (a perfect display for this cookbook library and wine collection), add to the charm of the home. 

Before

After

The basement remodel

Next up: the partially finished basement. What was once a glorified storage space is now a private bedroom with a roomy en-suite bathroom.

Before

After